PROJECT DETAILS
NEELUM JHELUM HYDROPOWER COMPANY (PRIVATE) LIMITED
Neelum Jhelum Hydropower Company (Private) Limited was incorporated on 18 November 2004 as a private limited company under the Companies Act 2017. The register office of the company is at WAPDA Administrative staff College Sector – H-8/1 Islamabad. The Company’s main objective is the development of Neelum Jhelum Hydropower Project for generation and sale of electricity. The company is the wholly owned subsidiary of Pakistan Water and Power Development Authority (WAPDA). The salient feature of the Project are as under:
Dam Type
Composite Dam ( Gravity + Rock fill )
Tunnel Length
Twin Tunnel, Length 19.6 Km
X-Section Area varies from 52m2 to 58m2
Single Tunnel, Length 8.94 km
X-Section Area 104 m2
Tailrace Tunnel, Length 3.54 km
X-Section Area 99 m2
Design Discharge
280 cumecs
Estimated Annual Energy
5150 GWh (5.15 billion units annually)
Consultants
Neelum Jhelum Consultants, a joint venture of:
- Montgomery Watson Harza (MWH) International Inc. USA
- NORPLAN A.S. Norway
- National Engineering Services Pakistan,
- Associated Consulting Engineers, Pakistan
- National Development Consultants , Pakistan
Commencement Date
January 2008
Height / Length
60/160 meters
Gross Head
420 m
Installed Capacity
969 MW, 4 Turbines, 242.25 MW each
Execution by
WAPDA through NJHPC
Contractor
A joint venture of:
- China Gezhouba Group Company (CGGC)
- China Machinery Engineering Corporation (CMEC)
Completion Date
March 31,2018